On January 4, the overhaul of Shandong Hengtong PV

2022-08-04
  • Detail

On January 4, the maintenance of Shandong Hengtong PVC plant was completed

the maintenance of Shandong Hengtong PVC production plant was completed. At present, no finished products have been offline. Therefore, there is no quotation due to the large error of the experimental results. It is expected to ship tomorrow or later; In terms of production expansion, the company's production expansion device at the end of 2005 has been basically installed, and it is expected to start after the Spring Festival. At that time, the annual production capacity will reach more than 100000 tons

note: the source of this reprint is indicated. The reprint is for the purpose of transmitting more information, and does not mean to agree with its view or confirm the authenticity of its content. The loading speed valve should be manually controlled to control the rising speed of the piston (the speed and safety valve are in one body)

Copyright © 2011 JIN SHI